Beijing Olympics Games Construction Project
Management Information Platform

 

Project overview

The "Beijing Olympics Games Construction Project Management Information Platform" is a unified construction information management platform set up by Litsoft for the Beijing Organizing Committee for the Olympic Games (BOCOG).

To successfully hold the "2008 Beijing Olympic Games", the construction of the arenas and stadiums is a crucial task for the BOCOG and Beijing Municipal Construction Commission. There are more than one hundred sports sites and facilities need to be built in China. Because they are scattered in different places of the country and they have different construction cycles and different project management software. In 2003, the construction of Beijing Olympics Games arenas and stadiums entered the stage of full-scale implementation. To guarantee the smooth completion of all sports sites, the BOCOG need to effectively supervise about one hundred construction projects distributed in the country. It should make timely and effective monitoring and control of the funding situation, construction progress, engineering quality and existing risks of each project to make effective decisions and secure their successful completion.

The "Beijing Olympics Games Construction Project Management Information Platform" is thus designed and developed against this background, and is used to manage every construction project in the country in an all-round way. Various parameters of construction projects will be gathered in time to be uploaded to the Beijing Olympics Games Construction Project Department, and project managerial personnel make timely analysis of these data to conduct effective regulation and control of projects under construction.

System architecture

Since the Beijing Olympics Games construction projects are characterized by numerous items, diversified investment, wide distribution area, great technical difficulties, strict quality requirement, many matters related to the communication and cooperation among projects and rigid progress control, the total scheme used 3-level platform as the overall arrangement. The level 1 platform is oriented to high-level decision-makers by providing service support. The level 2 platform is geared to regional administrators by providing services. The level 3 platform is designed for project owners, designing units, supervisory units and construction units. The data exchange is realized among all levels of platforms through the platform data exchange system to meet the requirements of all personnel for Beijing Olympics Games project construction management.

iNOVO Integration Server, iNOVO BPM Server, iNOVO Adapter, iNOVO MOM and iNOVO CM Server among EAI product lines of iNOVO are mainly used to realize the project management, e-government, coordinated office and information issue platform of the BOCOG, and provide the real-time heterogeneous system integration and data exchange of construction management systems like P3 and Menglong. The total system has fully shown the ideas of distributed data collection and concentrated data management for information platform, and offered complete business schemes and implementation reference for the Beijing Olympics Games construction projects, and even the domestic building industry.

System architecture

Screen shot 1

Screen shot 2

Technologies used

  • Application Server: BEA Weblogic 7.0
  • Development Environment: Jbuilder 7.0
  • Project Management Enviorment:ProjectServer2002、PVCS
  • Operating System: Solaris 9, MS Windows 2000
  • Hardware Platform: Sun v880, Sun v480, Lenovo WanQuan R630
  • Database Server: Oracle 9i